An old cooling tower system was converted to Clean CT-01™ ongoing treatment in May 2009. Prior to treatment, inner pipe surfaces were very corroded, rough and showed a lot of calcium scale. Only 4 months into the treatment, the condenser water piping was opened up. The surface had become much smoother with significantly reduced amount of corrosion. The client has continued to receive our ongoing service since.